tunnel form

Tunnel formwork is a system that allows casting of walls and slabs in one operation on a daily cycle. Construction durations are reduced significantly by this rapid system when compared to conventional methods.

Friday, February 25, 2011

progress photo

Hostel F3 - Block 1

current activity


site plan

College Management Office

One (1) College Management Office is located within each cluster.  
The provision of the room is in accordance with UPSI's requirement

The rooms provided are as follows:
  a. Principal Office
  b. Meeting Room
  c. 'Pengurus Kolej' office
  d. General office and space for 'Penolong Pengurus Kolej'
  e. Waiting Area

Principal Bungalow Residence

One (1) Principal Bungalow is located within each cluster.  

The rooms provided are as follows:
Ground Floor
  a. Car Porch
  b. Living and Dining Area
  c. Guest Room
  d. Dry and Wet Kitchen
  e.  2 nos. Bathrooms
  f. Terrace

First Floor
  a. Master Bedroom with ensuite Bathroom and 'Lanai'
  b. Bedroom 2 & 3 with 'Lanai'
  c. Family Area with 'Lanai'
  d. 2 nos. Bathrooms

Thursday, February 24, 2011

Mechanical & Electrical Works

Mechanical & Electrical works Consisting of :
a.Cold Water Plumbing
b.Sanitary Plumbing
c.Air-Conditioning and Ventilation System
d.Electrical Works
e.Lightning Protection System
f.Telecommunication System
g.Public Address System
h.Fire Fighting System

External and Infrastructure Works

External and Infrastructure Works Consisting of :
a.Road & Parking Areas
b.Drainage System
c.Water Reticulation
d.Sewerage Reticulation
e.Electrical Services Reticulation
f.Telecommunication Services Reticulation
g.Hard & Soft Landscaping
h.Sports and Recreational Facilities

Building Works

Building Works Consisting of :
a.18 Blocks of 5 Storey Student Hostel Blocks
b.2 Blocks of 2 Storey Central Facilities
c.3 Units of 2 Storey Principal Bungalow Residence
d.3 Units of Single Storey College Management Office
e.1 Unit of Maintenance Office
f.2 Units of TNB Sub-Stations
g.2 Units of Rubbish Collection Centres

Scope of Work

The scope of works include in this contract are generally comprising construction and completion of :-

A. Earthworks

B. Piling Work

C. Building Works

D. External and Infrastructure Works

E. Mechanical & Electrical Works

Central Facilities

Two blocks of Central Facilities are located between the Hostel Clusters.

Each Central Facilities is equipped with:


hostel

The Student Hostel consists of 18 blocks of five storey walk-up apartments arranged in three clusters. Two of the clusters are for female students and one cluster for male students. Each cluster consists of six blocks.

Each Student Hostel Block consists of: